Dallas Cowboys post game show on 105.3 The Fan | Listen Online | Cowboys Lose To Eagles 33-10  | Local Picks | Pick'em To Win | Cowboys News

Out With the Old at Dallas Love Field

The building contractor responsible for completely overhauling the aging interior and exerior of Dallas Love Field offered an update on their project Thursday.  The more than 500 million dollar project is now underway after some delays over the past couple years.  Southwest Airlines is putting up a lot of the cash, but bond money is also being used.  The entire project will completed in phases.  The entire 20 gate modernization should be done by the Fall of 2014.  The airport hasn’t had much in the way of a major overhaul since the late 1950’s.

Here’s the way Dallas Love Field looks today:

love field Out With the Old at Dallas Love Field

Here’s the way Dallas Love Field is expected to look by the end of 2014:

dr5 aerial south Out With the Old at Dallas Love Field

dr5 lobby departure Out With the Old at Dallas Love Field

ato Out With the Old at Dallas Love Field

stemarrival Out With the Old at Dallas Love Field