Arches In Place For Fort Worth Pedestrian Bridge

FORT WORTH (AP) – Huge cranes have been used to lift arch beams into place across the Trinity River for a new pedestrian bridge in Fort Worth.

Backers say the $3 million bridge should be completed by August.

The arches were put into place Monday as part of the 364-foot bridge. The span is expected to provide a link between Trinity Park and downtown Fort Worth.

The span is named for late community activist Phyllis Tilley.

(© Copyright 2012 The Associated Press. All Rights Reserved. This material may not be published, broadcast, rewritten or redistributed.)

Also Check Out:

The Taz Show

Listen Live